I-76

Project Overview

A tilt-up warehouse featuring distinct reveal patterns and meticulous layout.

This 638,856 SF warehouse was a spec build strategically located off a major highway transportation route in Pennsylvania. Our team’s scope included foundations, slab on grade, tilt-up including 155 panels to be cast on the building slab, and exterior paving.

Project Objectives

  • Deliver uniquely complex architectural reveals with accuracy in orientation, spacing, and design
  • Maintain coordination with specialty trades for efficient project sequencing and panel erection
  • Implement strong quality control measures for material inspections, layout verification, and formwork accuracy

Location

Uwchlan Township, PA

Market

Industrial

Primary Service

Tilt-Up

Client

Alston Construction

Project Size

4,000,000 SF

Additional Services

Foundations Flatwork Tilt-Up

The challenges

The scale of the warehouse and the uniquely customized reveal design required extensive planning and precise execution.

Complex reveals

The building design featured 44,000 LF of top-to-bottom reveals, each with distinct spacing, orientation, and design requirements.

Material volume

With 157,728 square feet of tilt panels, the project required a substantial volume of concrete, lumber, and other materials. No material waste was accepted, so our team had to be exact with the amount ordered.

The solutions

The work was driven by strong means-and-methods planning and a collaborative approach to comprehensive scheduling and coordination.

Quality control

All materials were thoroughly inspected upon arrival and returned if they did not meet our quality standards or specifications.

Detailed layout

Working closely with the architect, our team was able to layout and verify the location and spacing of every reveal throughout the building. Comprehensive panel drawings were used to confirm dimensions and ensure precise execution.

Precise formwork

Formwork was meticulously constructed and extensively verified, ensuring exact alignment of all openings, doors, and windows.

Inter-trade coordination

Consistent communication with the GC, steel contractor, and crane operator was essential to align project sequencing, keeping the work on schedule while minimizing conflicts on site.